mobilegr

MobileGR, 2018-03-08

EV Charging Stations

Electric charging stations where installed in 2011.

  • 5 downtown (1 on-street)
  • 1 in Oak Industrial Park
  • 1 at Waste Water site.

All stations have been upgraded; new stations have two cords and have retaining clips to help keep the cords off the ground which was an issue with the previous charging stations.

MobileGR, 2017-12-14

The MobileGR commision has approved its meeting schedule for 2018. All meetings are at 50 Ottawa Ave. NW and occur at 8AM. Dates are:

Notes from 2017-05-11 MobileGR Commision Meeting

  • There will be three upcoming events with mobility integration & promotion: rock the block, GR's first Asian Festival, and Festival of the Arts.
    • Of the three - Rock The Block (10K estimated participants), Asian Festival (20K), and Festival (200K) - Rock The Block is the first event not downtown. The guidelines for event sponsorship are Downtown specific if read verbatim, these guidelines need to be revisited after the expanded commission is seated

Pages

Subscribe to RSS - mobilegr